Conduit Way Cycleway 72 Links-In
We are proposing a new cycle connection on Conduit Way to link into to the planned Cycleway 72 (from Wembley Central to Harlesden station).
The proposed changes are shown graphically in the attached drawings and are summarised as follows:
- 20mph Zone and traffic calming features – A new 20mph Zone is proposed Conduit Way, Durand Way, Wyborne Way, Sunny Crescent, Twybridge Way, Meadow Garth and Pramukh Swami Road along with sinusoidal (smooth stop) speed humps to reduce vehicle speeds and the severity of accidents.
- Junction improvement – The existing mini-roundabout at the junction of Brentfield Road and Meadow Garth will be removed and replaced with “give-way” priority junction and raised speed table.
- Upgraded pedestrian crossing – A new parallel crossing (for use by pedestrian and cyclists) is proposed at the junction of Brentfield Road and Meadow Garth. This will improve priority and accessibility for both pedestrians and cyclists.
- Raised entry treatments – Raised speed tables are proposed at side roads junction with Conduit Way to reduce vehicle speeds and increase accessibility for pedestrians.
Additional greening – Additional trees and greening are proposed to improve the public realm along the length of the cycleway connection.
Phases
Phases overview
Phase 1: Consultation
Consultation
Consultation
3 November 2026 00:00 - 4 December 2026 23:59
Upcoming and ongoing events in this phase
- 11Nov
Public Exhibition
Events
Upcoming and ongoing events
Event date: November 11th, 2026 from 15:00 to 19:00.
Brent Civic Centre