Skip to main content
London Borough of Brent Home
Unfortunately, you can't participate in this project anymore because it has been archived

Kilburn Healthy Neighbourhood

We are proposing to introduce trial measures for an 18-month period to reduce cut-through traffic in the Dyne Road area and the details are set out below. These measures prioritise resident motor access and limit access for vehicles that are not eligible within the study area. You should see a significant reduction in noise, road danger and traffic volumes once the scheme is implemented.

Phases

Phases overview
Phase 1: Consultation - Kilburn Healthy Neighbourhood
Consultation - Kilburn Healthy Neighbourhood

Consultation - Kilburn Healthy Neighbourhood

11 January 2024 00:00 - 10 February 2024 00:00

We are proposing to introduce trial measures for an 18-month period to reduce cut-through traffic in the Dyne Road area and the details are set out below. These measures prioritise resident motor access and limit access for vehicles that are not eligible within the study area. You should see a significant reduction in noise, road danger and traffic volumes once the scheme is implemented.

Take the survey

The survey is no longer available, since this project is no longer active.