Stonebridge Park Station Cycleway 72 Links-in
We are proposing a new cycle connection on Stonebridge Park Station to link into to the planned Cycleway 72 (from Wembley Central to Harlesden station).
Brent Council are working with Transport for London (TfL) to deliver a new cycle route named Cycleway 72 (C72) from Wembley to Willesden Junction, with the first phase focusing on the section between Wembley Central and Harlesden stations. Following a public consultation in 2023 and further design work and engagement, the scheme is now due to start detailed design this autumn which will take around a year to complete with a construction timeline to be set out afterwards, subject to statutory consultation and final approvals. Further details on the background to the scheme are available on TfL’s website - Cycleway 72 Wembley Central to Harlesden - Transport for London
To maximise the benefits of C72 and provide a network of safe and attractive cycle routes across Brent, we are now consulting on proposals for a series of ‘Links-in routes’ to connect C72 with local residential areas and places of interest. These routes aim to increase connectivity between the new Cycleway 72 and the existing cycle network, improve road safety and enhance the public realm.
Phases
Consultation
The proposed changes are shown graphically in the attached drawings and are summarised as follows:
- New parallel crossing and cycle connection – A new footway, cycle track and parallel crossing (for use by pedestrians and cyclists) are proposed on the eastern side of Old North Circular Road to connect existing cycling facilities with Cycleway 72.
- Upgraded pedestrian crossing – A new zebra crossing is proposed at the entrance to Stonebridge Park station. This will improve priority and accessibility for pedestrians.
- Junction improvement – The layout of the Argenta Way / Old North Circular Road junction will be improved by removing the existing traffic splitter and tightening the corners.
Additional greening – Additional trees and greening are proposed to improve the public realm along the length of the cycleway connection.
Upcoming and ongoing events in this phase
- 11Nov
Public Exhibition
Events
Upcoming and ongoing events
Event date: November 11th, 2026 from 15:00 to 19:00.
Brent Civic Centre